Parish Hall Renovation 2008

Click the slideshow navigation image button to open the navigation palette and browse through the days. Then, click and drag the slideshow navigation pallette image button to move the navigation palette to a place of your choosing. Or, just click the Play button and watch the slide show!

 
Hide Thumbs First Previous Pause Next Last
Slideshow speed: 5 seconds
 
Move
20080624- MG 1543 Lg
  • 20080505-P1000600
    Week 1, Day 1: Deconstruction
  • 20080505-P1000604
    Week 1, Day 1: Deconstruction
  • 20080505-P1000612
    Week 1, Day 1: Deconstruction
  • 20080506- MG 0117
    Week 1, Day 1: Deconstructed West Wall (Camp Meade Road)
  • 20080505-P1000616
    Week 1, Day 1: Deconstruction
  • 20080506- MG 0126
    Week 1, Day 2: Deconstructed South Wall (Maple Avenue)
  • 20080506- MG 0122
    Week 1, Day 2: Deconstructed East Wall (Under Altar)
  • 20080506- MG 0120
    Week 1, Day 2: Deconstructed North Wall (Playground)
  • 20080508- MG 0128
    Week 1, Day 4: Construction tools
  • 20080508- MG 0129
    Week 1, Day 4: Construction tools
  • 20080508- MG 0130
    Week 1, Day 4: Cement for blocking in the windows
  • 20080508- MG 0138
    Week 1, Day 4:
  • 20080508- MG 0147
    Week 1, Day 4: Construction tools
  • 20080508- MG 0150
    Week 1, Day 4: Electrical
  • 20080508- MG 0154
    Week 1, Day 4: Mason's hammer, used for blocking in the windows
  • 20080508- MG 0161
    Week 1, Day 4:
  • 20080508- MG 0178
    Week 1, Day 4: New AC/heating units for the nave.
  • 20080508- MG 0181
    Week 1, Day 4: New AC/heating units for the nave.
  • 20080510- MG 0447
    Week 1, Day 6: New sump
  • 20080510- MG 0444
    Week 1, Day 6: New AC/heating piping.
  • 20080510- MG 0445
    Week 1, Day 6: New AC/heating units

  • 20080513- MG 0472
    Week 2, Day 9: Blocks for windows
  • 20080513- MG 0473
    Week 2, Day 9: Week 2, Day 9: Blocked windows. Most windows will have a 16" glass window at the top; the rest will be blocked in.
  • 20080513- MG 0477
    Blocked windows. Most windows will have a 16" glass window at the top; the rest will be blocked in.
  • 20080513- MG 0480
    Week 2, Day 9: Preparing for the built-in bookshelves for the library and bookstore.
  • 20080513- MG 0481
    Week 2, Day 9: Framing and windows.
  • 20080513- MG 0486
    Week 2, Day 9: Facer for blocked windows to match original stone work. This is the same facer used on the front porch.
  • 20080513- MG 0488
    Week 2, Day 9: Framing for library and bookstore built-in book shelves.
  • 20080513- MG 0496
    Week 2, Day 9: Inside sump.
  • 20080513- MG 0493
    Week 2, Day 9: Inside sump will pump up the wall, through this pipe to the outside sump.
  • 20080517- MG 0661
    Week 2, Day 14: New copper piping for heating and cooling system; electrical upgrades.
  • 20080517- MG 0663
    Week 2, Day 14: New copper piping for heating and cooling system. This is where the duct work for the old AC system was attached. No soldering was used on the joints; a specialized machine crimped all the joints together.
  • 20080517- MG 0678
    Week 2, Day 14: Copper piping for new AC/heating.
  • 20080517- MG 0682
    Week 2, Day 14: Electircal work.
  • 20080517- MG 0686
    Week 2, Day 14: Main copper piping coming from the AC/heating machines outside. This piping lives in the kitchen ceilling and branches out into the parish hall, where it splinters off to the sides and runs up into the nave to meet the new AC/heating units.

  • 20080529- MG 0735
    Week 4, May 29
  • 20080529- MG 0737
    Week 4, May 29 - New windows and window units
  • 20080529- MG 0740
    Week 4, May 29
  • 20080529- MG 0745
    Week 4, May 29
  • 20080529- MG 0746
    Week 4, May 29
  • 20080529- MG 0754
    Week 4, May 29
  • 20080529- MG 0762
    Week 4, May 29

  • 20080601- MG 1193 Lg
    Week 5, June 1: HVAC System
  • 20080601- MG 1198 Lg
    Week 5, June 1: HVAC System
  • 20080601- MG 1205 Lg
    Week 5, June 1: HVAC System
  • 20080601- MG 1226 Lg
    Week 5, June 1: HVAC System
  • 20080601- MG 1227 Lg
    Week 5, June 1: HVAC System
  • 20080601- MG 1231 Lg
    Week 5, June 1: HVAC System
  • 20080601- MG 1235 Lg
    Week 5, June 1: HVAC System
  • 20080601- MG 1238 Lg
    Week 5, June 1: HVAC System
  • 20080601- MG 1243 Lg
    Week 5, June 1: HVAC System
  • 20080601- MG 1244 Lg
    Week 5, June 1: HVAC System
  • 20080601- MG 1245 Lg
    Week 5, June 1: HVAC System
  • 20080601- MG 1246 Lg
    Week 5, June 1: HVAC System
  • 20080603- MG 1248 Lg
    Week 5, June 3: upgraded electrical and water lines
  • 20080603- MG 1256 Lg
    Week 5, June 3: pending electrical upgrade
  • 20080603- MG 1258 Lg
    Week 5, June 3: electric and water feeds to new HVAC system
  • 20080603- MG 1268 Lg
    Week 5, June 3: pending electrical upgrade
  • 20080603- MG 1270 Lg
    Week 5, June 3: pending electrical upgrade
  • 20080603- MG 1275 Lg
    Week 5, June 3: pending electrical upgrade
  • 20080603- MG 1279 Lg
    Week 5, June 3: pending electrical upgrade

  • 20080624- MG 1543 Lg
    Week 8, Day 51: We have drywall!
  • 20080624- MG 1544 Lg
    Week 8, Day 51: We have drywall!
  • 20080624- MG 1549 Lg
    Week 8, Day 51: We have drywall!
  • 20080624- MG 1553 Lg
    Week 8, Day 51: We have drywall!
  • 20080624- MG 1555 Lg
    Week 8, Day 51: We have drywall!
  • 20080624- MG 1558 Lg
    Week 8, Day 51: We have drywall!
  • 20080624- MG 1561 Lg
    Week 8, Day 51: We have drywall!
  • 20080624- MG 1566 Lg
    Week 8, Day 51: We have drywall!

20080624- MG 1543 Lg